







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with







See the difference
Before
After
Before
After
Before
AfterHow Much Does Kitchen Remodel Cost in Woodland Hills?
A full kitchen remodel in Woodland Hills, CA typically runs $14,000 to $45,000 in 2026, with most mid-range projects landing between $22,000 and $32,000. Small kitchen updates start around $9,000, while larger custom renovations with premium materials can exceed $60,000. These figures reflect the current labor and material rates we’re seeing across the San Fernando Valley, including Woodland Hills, Calabasas, Tarzana, and Encino.
What you’ll actually pay depends on the size of your kitchen, whether you’re moving walls or plumbing, the quality of cabinetry and countertops you select, and whether your home’s electrical or plumbing needs bringing up to current Los Angeles County code. We’ll walk you through every line item below so you can budget with real numbers, not vague ranges.
At home, our Kitchen Remodel in Woodland Hills service starts with a written price before any work begins, so you’ll know exactly what your project costs before we unpack a single tool.

Kitchen Remodel Cost Breakdown (2026)
Here’s what we’re seeing across Woodland Hills kitchens right now. These ranges assume a standard 10×12-foot kitchen in a mid-century ranch or a 1980s-era Ventura Boulevard condo. If your kitchen is larger, the numbers scale accordingly.
| Component | Typical Range (Woodland Hills, 2026) | Notes |
|---|---|---|
| Full kitchen remodel | $14,000 – $45,000 | Gut-to-finish, mid-range materials, permits included |
| Small kitchen remodel | $9,000 – $20,000 | Compass kitchen in a condo or small 1950s home, no wall changes |
| Cabinet installation | $4,000 – $13,000 | Stock to semi-custom. Custom cabinetry pushes past $18,000 |
| Countertop installation | $2,000 – $6,500 | Quartz from Cambria, Silestone, or Caesarstone; stone install in 1 – 2 days |
| Backsplash installation | $800 – $2,500 | Subway tile through full-height slab |
| Kitchen island installation | $3,000 – $10,000 | Standard 4×7 island with cabinetry, countertop, and electrical |
| Plumbing changes | $1,200 – $4,500 | Moving a sink line, adding a pot filler, relocating a gas line |
| Electrical upgrades | $1,000 – $5,000 | New circuits for appliances, under-cabinet lighting, code compliance |
| Permits | $800 – $3,000 | Los Angeles County building permits, plan review, inspections |
What drives cost up: moving the sink or stove, removing load-bearing walls, upgrading your electrical panel from 100 to 200 amps (common in older Woodland Hills neighborhoods like Woodland West and Walnut Acres), and selecting custom cabinetry from Wellborn or designer slab from Cambria.
What keeps cost down: keeping appliances in place, refacing cabinets instead of replacing them, choosing stock KraftMaid cabinetry, and scheduling during the slower fall or winter months when crews have more availability.
What Affects Kitchen Remodel Pricing in Woodland Hills
- Age of your home. Many Woodland Hills homes south of Ventura Boulevard were built in the 1950s and 1960s, which means galvanized plumbing, knob-and-tube wiring remnants, and undersized electrical panels. Any of those three will add $2,000 to $6,000 in code-mandated upgrades before we can pass inspection.
- Scope of work. A cosmetic refresh (new countertops, backsplash, paint, hardware) stays under $12,000. A full gut with wall removal, ceiling work, and a layout change moves into the $30,000+ range. In our experience, kitchens in the Vista de Oro and South of the Boulevard neighborhoods tend toward larger layouts with more visible structural work.
- Cabinet choice. Stock cabinets from KraftMaid run $4,000 to $8,000 for a standard kitchen. Semi-custom from Wellborn starts around $9,000. Fully custom cabinetry from a local Valley millwork shop regularly exceeds $20,000 in Woodland Hills.
- Countertop material. Granite and basic quartz from Silestone or Caesarstone run $50 to $90 per square foot installed. Cambria slabs start around $80 per square foot and climb past $140 for premium styles. Waterfall islands and full-height backsplashes add $2,500 to $6,000.
- Permit timeline. Los Angeles County plan review for kitchen remodels with structural changes runs 4 to 12 weeks depending on the department’s volume. Non-structural, like-for-like replacements can often proceed with an express permit in 1 to 2 weeks.
- Financing and payment terms. Projects that require a general contractor, plumber, electrician, and tile setter all on-site will carry a higher base price than a single-crew cabinet-and-countertop swap, regardless of materials.

What a Kitchen Remodel Includes When We Do It
Our approach to kitchen remodeling in Woodland Hills is structured so you always know who is arriving at your door and what you’ll pay before work starts. Every project begins with a detailed scope walk: we measure, we inspect behind the existing cabinets, we check the panel, and we write the number down. That written price covers the agreed scope. If we find something unexpected mid-project, we stop, show you photos, and give you a written change order before proceeding.
Each crew member on your Woodland Hills kitchen project is background-checked and identity-verified under The Threshold Standard, our verification process that applies to every technician we send. You’ll receive the name and photo of each person scheduled to work in your home before they arrive, and every one of them will show a photo ID badge at your door. They arrive in clean, marked uniforms. You’ll never wonder who is walking into your kitchen.
Our cabinetry comes from KraftMaid and Wellborn. Countertops come from Cambria, Silestone, or Caesarstone. Fixtures are Kohler, Moen, Toto, or Grohe. These are the same brands you’d find in a custom Valley remodel, available through our specification-grade material partnerships with professional pricing.
Every completed kitchen carries the 365-Day Done Right Promise. If any part of the work is not right within 365 days of the completion date, we make it right at no cost to you. The terms are in writing: what’s covered, what’s excluded, and for how long. No fine-print surprise, no dispute process. If a repair or installation fails, a return visit is free. Always.
Typical Kitchen Remodel Scenarios in Woodland Hills
Condo Kitchen Refresh: $9,000 – $16,000
If you own a condo off Ventura Boulevard or in a Warner Center high-rise, your kitchen remodel is almost always cosmetic. HOA restrictions usually prohibit moving plumbing or gas lines in a shared wall, and many associations require approval before any sound-producing work begins. A typical scope here: replace countertops with quartz, install a new sink and faucet from Kohler or Moen, add a tile backsplash, and either reface or replace cabinets. Expect $9,000 to $16,000 depending on material grade and whether the condominium association requires a licensed and bonded general contractor on file.
1950s Ranch Kitchen Update: $18,000 – $32,000
South of the Boulevard, the neighborhood stretches of Woodland West and the area around Serrania Avenue have a high concentration of mid-century ranch homes with original kitchens. These jobs typically involve opening one wall to create a sightline into the living room, relocating the refrigerator, upgrading the electrical panel, and installing semi-custom cabinets. We regularly see projects in this style land between $18,000 and $32,000. The wall removal adds structural engineering and a beam, which alone runs $3,000 to $7,000.
Full Custom Kitchen: $45,000 and Up
For a large custom kitchen in the gated communities above Mulholland or a particularly spacious property near El Camino Real, budget $45,000 and up. These projects include moving plumbing, adding a commercial-style range with proper venting, building a large custom island with seating, under-cabinet and in-cabinet lighting, and either Cambria or designer Caesarstone surfaces. The work typically takes 8 to 12 weeks and involves a structural engineer, two or more inspections, and full design documentation.
How to Save on a Kitchen Remodel in Woodland Hills
If you’re working with a tighter budget, here’s what actually saves money without cutting corners where it matters.
- Keep the sink and stove where they are. Moving plumbing or gas is one of the fastest ways to add $3,000 to $6,000. In many Woodland Hills kitchens, the original layout is still functional. An island can be added without moving the sink line.
- Choose stock or refaced cabinets. KraftMaid stock lines deliver solid construction at half the cost of semi-custom. If your cabinet boxes are still square, refacing (new doors, drawer fronts, hardware) usually saves 30 to 40 percent versus full replacement.
- Pick a mid-range quartz. Caesarstone and Silestone both carry styles in the $60 to $80 per square foot range that look nearly identical to their $120+ slabs. You’re not compromising durability, just the brand’s designer markup.
- Do the demolition yourself or skip the gut. If your existing tile and drywall are sound, a direct overlay or a simple cabinet swap keeps the waste-hauling and dumpster fees off the invoice.
- Get your written estimate first. Every serious contractor in Woodland Hills should be able to give you a written price before work starts. If someone won’t put it in writing, that’s your signal to keep looking. We provide a written price on every project without exception. Call (831) 290-6866 for a free estimate, and you’ll have real numbers to compare before making any decision.
Frequently Asked Questions: Kitchen Remodel Cost in Woodland Hills
How much does a kitchen remodel cost in Woodland Hills in 2026?
A full kitchen remodel in Woodland Hills runs $14,000 to $45,000, with most mid-range projects landing between $22,000 and $32,000. A small kitchen or condo refresh starts around $9,000. Call (831) 290-6866 for a written, itemized estimate for your specific kitchen.
Is it cheaper to repair or replace kitchen cabinets?
Replacing is usually cheaper than repairing when more than two or three cabinet doors or drawer fronts are damaged. Refacing costs roughly $2,500 to $6,000 in Woodland Hills, while full replacement runs $4,000 to $13,000 depending on whether you choose stock or semi-custom. If the cabinet boxes are water-damaged or the hinges are failing, replacement is the better long-term decision.
Can you remodel a kitchen in Woodland Hills for under $10,000?
Yes, if the footprint stays the same. A $9,000 to $10,000 budget covers new countertops, a tile backsplash, painted or refaced cabinets, new hardware, and a new sink and faucet in a small 8×10 or 10×10 kitchen. You won’t be moving walls or upgrading the electrical panel at that price point, but in a small condo or starter home, it transforms the room.
How long does a kitchen remodel take in Woodland Hills?
A cosmetic kitchen refresh takes 1 to 2 weeks. A full remodel with cabinet replacement, countertops, backsplash, and lighting takes 4 to 8 weeks. If you’re moving plumbing or removing walls, plan for 8 to 12 weeks including Los Angeles County plan review and inspections.
Do I need a permit for a kitchen remodel in Woodland Hills?
Yes, for any work that moves plumbing, gas, or electrical lines, or that removes or alters walls. Like-for-like replacements (swapping cabinets, countertops, or a sink in the same location) can often proceed with an express permit. Your contractor should handle all permitting; if they tell you to skip it, that’s a red flag. Unpermitted kitchen work in Los Angeles County can complicate a future home sale and may void your homeowner’s insurance.
How much does a kitchen island cost to add in Woodland Hills?
A standard 4×7 kitchen island with base cabinetry, a countertop, and a new electrical circuit runs $3,000 to $10,000. The price climbs if you’re adding a sink or a cooktop to the island, since that means running new plumbing or gas lines under the slab or through the floor joists.
What’s the ROI on a kitchen remodel in Woodland Hills?
Based on current San Fernando Valley resale data, a mid-range kitchen remodel recovers roughly 60 to 75 percent of its cost at sale. In neighborhoods like Woodland West and Vista de Oro, an updated kitchen is also one of the fastest ways to shorten time-on-market. Buyers in this area expect quartz counters and soft-close cabinetry as a baseline.
Do you offer free estimates for kitchen remodels in Woodland Hills?
Yes. We provide a free written estimate for every kitchen project in Woodland Hills. The price we show you is the price you pay. Call (831) 290-6866 and you’ll speak with a live person, not a voicemail system.
Why Choose Mason Remodeling for Your Woodland Hills Kitchen
Our company, Mason Remodeling Co Woodland Hills, has provided general contracting, bathroom remodeling, and whole-home remodeling services since its founding in 2004, operating as part of the Threshold Group family of home-service companies. Each Mason Remodeling location is independently owned and operated and holds to Threshold Verified standards on every job.
The name mason has meant careful, lasting building for centuries, and we carry that standard into every kitchen we renovate in Woodland Hills. Before we quote a single dollar, we walk the project with you, inspect what’s behind the cabinets, check the panel, measure everything, and write the number down. You get that written price before any work begins. Not an estimate that grows, not a verbal range that shifts at the final invoice. A written price.
When our crew arrives at your Woodland Hills home, you’ll already know who is coming. Each technician is background-checked, identity-verified, uniformed, and introduced to you by name and photo before they reach your door. They’ll present a photo ID badge when they arrive. The Threshold Standard is not an optional add-on; it’s how we’ve operated since 2004.
If the work is not right within one year of your completion date, we make it right at no cost under our 365-Day Done Right Promise. A free return visit is provided if a repair or installation fails. No charge, no dispute process, no conditions. The coverage terms are stated plainly in writing: what’s covered, what’s excluded, and for how long.
A live person answers our phone 24 hours a day, 7 days a week. Weekends, holidays, 2 a.m. You’ll reach a person, not a phone tree. Call (831) 290-6866 and ask for a kitchen estimate. We’ll schedule your walkthrough, hand you a written price, and never surprise you at the end.
Neighborhoods We Serve in Woodland Hills
Our Woodland Hills kitchen crews work across the entire community: Woodland West, Walnut Acres, Vista de Oro, the Warner Center district, South of the Boulevard, the area around Serrania Avenue, and the hillside communities above Mulholland Drive. If you’re in a condo near the Village at Westfield Topanga or a larger property near El Camino Real, we handle every type of kitchen remodel: small refresh, full renovation, custom rebuild, and island addition.
If you’re comparing prices in neighboring markets, our kitchen remodel service has helped homeowners across the San Fernando Valley, including Tarzana, Encino, Calabasas, Canoga Park, and West Hills. Each property has its own structural conditions and code requirements, but the process stays the same: measure, write the price, confirm the scope, deliver on time.
Get Your Woodland Hills Kitchen Remodel Price Today
Before you commit to any contractor, get a written price from a company that has operated in this market since 2004. Our estimates are free, detailed, and itemized. You’ll know exactly what the cabinetry costs, what the countertops cost, what the labor costs, and what the permit fees are. No vague hand-waving, no “we’ll see how it goes.”
Call (831) 290-6866 now. A live person will answer, schedule your in-home walkthrough at a time that works for you, and confirm that your written price arrives before any work begins. That’s how kitchen remodeling in Woodland Hills should work, and that’s how Mason Remodeling does it.
Pricing reflects the Woodland Hills market as of 2026. Mason Remodeling Co Woodland Hills offers free estimates – call (831) 290-6866.
Written by Isaac Pruett, Owner at Mason Remodeling Co Woodland Hills, serving Woodland Hills since 2004.
What Our Customers Say
"Bathroom gut job. Replaced the old tub with a walk-in shower and added a niche. Waterproofing was done properly with a flood test before tile."
- Greg L."Very respectful in the house. Shoe covers every day and a cleanup every evening."
- Alma V."Great quality tile work. The countertop template slipped by a week, but the project lead explained and kept us updated."
- Susan Y.











