







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Delta Home Additions & ADU: The Woodland Hills Owner’s Guide
Delta home additions and ADU construction in Woodland Hills typically runs $45,000 to $130,000 for an addition and $90,000 to $220,000 for a full accessory dwelling unit, depending on square footage, site prep, and finish level. We install and build Delta-compatible addition and ADU projects across Woodland Hills, and we’re usually able to get a written price in your hands within days of the first walkthrough, not weeks. Most owners we meet in Woodland Hills discover their project has gotten more complicated than expected when a foundation issue, roofline tie-in, or utility connection turns a simple bump-out into a full structural build, and that’s exactly the point where a real general contractor earns their keep.
Which Delta Models This Applies To
Delta’s approach to home additions and ADUs isn’t a one-size product line. The common thread is that Delta projects usually begin as pre-engineered or semi-custom plans, and the compatibility question is whether your existing foundation, roofline, and electrical panel can carry the new load. In Woodland Hills, we often work on additions tied to homes built between the 1950s and 1980s, and the first thing we check is whether the original framing matches what the Delta plan assumes. A 2×4 exterior wall from 1962 does not carry the same load as a modern 2×6 wall, and that single fact changes the engineering package more than most homeowners expect. The OEM-versus-aftermarket decision for a Delta addition usually comes down to plans and materials: Delta’s own material packages tend to be consistent, but a quality aftermarket spec using KraftMaid cabinetry, Cambria or Silestone countertops, and name-brand fixtures like Kohler or Moen often gives you better finish options at roughly the same installed cost. We stock common framing, tie-in, and utility-connection components on our trucks so a site visit doesn’t stall out waiting on basic hardware.
Styles & brands we work with







Signs Your Delta Home Additions & ADU Is Failing
- Floor slope or bounce near the tie-in point. When an addition pulls away from the original structure, the floor system transfers load unevenly. We see this most often in Woodland Hills homes where the original slab has settled over decades of dry-season soil movement.
- Cracks at the ceiling-to-wall junction inside the addition. This is usually differential settlement or a failed shear connection. It’s not cosmetic, and in Woodland Hills it often traces back to expansive clay soils that shift every wet season.
- Doors or windows in the addition that stick seasonally. Wood framing moves with humidity cycles, but a persistent bind means the header or jamb is carrying weight it wasn’t designed for.
- Water staining or musty smell along the addition’s exterior wall. The flashing detail where a Delta addition ties into the main roofline is the number-one leak point we repair in Woodland Hills. If it was flashed wrong at the original build, water gets in quietly for years.
- Electrical circuits in the addition that trip or dim when appliances cycle. This points to an undersized subpanel or a shared circuit running too far from the main panel. In Woodland Hills, many pre-2000 additions were wired to the edge of code, and modern loads push them over.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
In Woodland Hills, a full Delta-style home addition runs $45,000 to $130,000 installed. ADU construction runs $90,000 to $220,000. The range is driven by square footage, foundation work, utility upgrades, and finish level, not by markup games. A 400-square-foot bump-out with basic finishes sits at the low end; a detached ADU with a full kitchen, separate panel, and site retaining walls lands at the high end. What’s included in our written price: demolition of the existing wall or slab if needed, structural engineering, permits, framing, roofing tie-in, rough and finish electrical, plumbing where applicable, drywall, paint, and the finish materials we specify together before any work starts. You get one written price before a single tool is unpacked, and our 365-Day Done Right Promise covers corrections at no cost for a full year from the completion date. We also include a written guarantee with plainly stated terms on every project, never as an add-on.
DIY or Call Us?
An addition or ADU is not a DIY project, and anyone who tells you otherwise is selling something. The structural tie-in alone, cutting into a load-bearing wall or connecting a new roofline to an existing one, is genuinely dangerous if done wrong, and a failed connection can sag, leak, or fail outright within a season. What you can safely do as a homeowner is document what you’re seeing: measure the addition’s footprint, note where the cracks or leaks appear, and check your panel for spare breaker slots. That information helps us give you a straighter answer on the first call. If you’re in Woodland Hills and wondering whether your Delta addition needs a repair or a rebuild, call (831) 290-6866 and tell us what you’re seeing. We’ll tell you what it takes and what it costs.
FAQs

A properly built addition or ADU in Woodland Hills should last 50 to 80 years with normal maintenance, though the roof tie-in and exterior flashing typically need attention every 10 to 15 years due to our dry-season heat and seasonal soil movement. If your addition is failing before the 20-year mark, the original build was almost certainly the problem. Call (831) 290-6866 for an exact assessment, and we’ll give you a straight answer on expected remaining lifespan.
Most failing additions can be repaired rather than rebuilt, as long as the framing is still sound and the foundation hasn’t shifted past a recoverable point. Repairs typically focus on the tie-in connection, flashing, or utility feeds, and we’ll tell you honestly if a rebuild is the cheaper long-term option. Estimates are free, so call (831) 290-6866 and we’ll take a look.
A full home addition in Woodland Hills typically takes 3 to 6 months from permit to final inspection, and a detached ADU usually runs 4 to 8 months depending on site prep and utility scope. We lay out the full timeline in writing before work starts, and we don’t leave you with a punch list of things to chase down yourself. Call (831) 290-6866 to schedule a walkthrough and get a real schedule.
We stock common framing hardware, flashing, tie-in connectors, and utility-connection components on our trucks, so most work doesn’t stall waiting on basic parts. For finish materials we buy through specification-grade partners including KraftMaid, Cambria, and Silestone, which means you’re not paying retail markup on fixtures and surfaces. Call (831) 290-6866 and tell me what you need done. I’ll tell you what it takes and what it costs. Then we get to work.
Written by Isaac Pruett, Owner, Mason Remodeling Co – Woodland Hills, CA at Mason Remodeling Co Woodland Hills, serving Woodland Hills and nearby areas.


