







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Owens Corning Home Additions & ADU: The Woodland Hills Owner’s Guide
A home addition or ADU built to Owens Corning specifications in Woodland Hills typically runs $45,000 – $130,000 for the addition and $90,000 – $220,000 for a detached ADU, depending on square footage, site conditions, and finish level. We install Owens Corning insulation, roofing, and weather-barrier systems as part of our framing and finish work, which means the Owens Corning components get matched to the structure correctly from day one. Most owners discover a problem with an Owens Corning product not when it fails outright, but during a remodel or addition when an inspector or our crew finds compromised insulation, a roof system that was never flashed properly, or vapor barrier that’s been baking in Valley heat for 20 years.
Here’s the reality we see in Woodland Hills: homes built in the 1960s and 1970s around neighborhoods like Walnut Acres, Woodland West, and the flats south of Ventura Boulevard often carry Owens Corning fiberglass batts that have compacted, settled, or been chewed through by rodents. When you’re adding square footage and tying into that existing envelope, the old product has to be evaluated honestly. We do that before we write a number, not after.
Which Owens Corning Models This Applies To

Owens Corning doesn’t make “home addition” or “ADU” kits. What they make are the building-science layers that go into every one we frame: insulation (PINK Fiberglas batts, blown-in AttiCat, FOAMULAR rigid board), roof decking and shingle systems (Duration, Oakridge, TruDefinition), and weather barriers. The compatibility question is less about a model number and more about matching the right Owens Corning product to your specific addition or ADU build in Woodland Hills.
Here’s the gotcha most people don’t see coming: Woodland Hills sits in California Climate Zone 9, which means Title 24 energy code requires R-38 attic insulation for new construction and additions, not the R-30 you might get away with elsewhere. Owens Corning PINK batts rated R-30 simply won’t pass inspection here for an ADU ceiling. You need R-38 or better, or you need to combine layers, or use blown-in AttiCat to hit the required depth. We know which inspectors in the City of Los Angeles jurisdiction will check this and which ones will flag it on the rough inspection. That’s local knowledge you can’t get from a product spec sheet.
For the “OEM vs aftermarket” decision on Owens Corning: insulation and roofing are commodity products with tight manufacturing tolerances, but we stock Owens Corning specifically because their batts hold their R-value over time in dry heat better than some budget brands we’ve pulled out of older Woodland Hills homes. If you already have Owens Corning in existing walls and you’re extending those walls, we match the product family so the thermal performance is consistent across the seam. Mixing brands won’t void any warranty, but consistency matters when you’re trying to keep a west-facing ADU below 80 degrees in August.
We’re an independent contractor, by the way. We install Owens Corning products and know their spec sheets cold, but we’re not owned by or affiliated with the company. That means we can tell you honestly when a different product makes more sense for your job.
Styles & brands we work with







Signs Your Owens Corning Home Additions & ADU Is Failing
If you’re planning an addition or ADU and already have Owens Corning products in your home, here’s what tells us the existing material needs to come out rather than get built over:
- Compacted or Settled Batts in the Attic: PINK batts that have shrunk from 10 inches to 4 inches have lost most of their R-value. We see this constantly in Woodland Hills homes from the ’70s and ’80s, where decades of heat cycling have compressed the fibers. You’re paying to cool air that escapes through your roof.
- Rodent Damage in Existing Insulation: The hills above Ventura Boulevard push rats and squirrels down into attics during dry seasons. Owens Corning fiberglass gets shredded for nesting material. If we find trails, tunnels, or droppings, that insulation is contaminated and has to be removed before we tie new construction into the roofline.
- Water Staining on Owens Corning Roof Decking: If your existing roof has Owens Corning shingles but we see staining on the underside of the decking, the shingles aren’t the problem – the underlayment or flashing is. In a Valley rain year like we had in 2023, that becomes a five-figure surprise if you ignore it before adding on.
- Sagging or Gapped FOAMULAR Boards: If rigid board was used on a stem wall or under slab and it’s pulling away at the seams, you have a thermal break failure. Your new ADU floor will be cold in December and hot in July, and the concrete will sweat.
- Discolored or Brittle Vapor Barrier: Owens Corning vapor barrier products degrade under UV exposure. If a remodel left barrier exposed for a season before we arrive, it’s likely brittle and no longer doing its job. We cut it out and re-wrap before sheathing goes on.
Replacement Cost & What’s Included

Here’s the honest math for Woodland Hills. A home addition runs $45,000 – $130,000 depending on whether you’re adding a bedroom over the garage or a full primary suite with a bathroom. An ADU runs $90,000 – $220,000 depending on whether it’s a garage conversion or a ground-up detached build with its own utilities. Those numbers include the Owens Corning insulation, roof system, and weather barrier, not just the framing and drywall.
What drives the range more than anything: site access on Woodland Hills hillside lots, soil conditions if we’re pouring a new foundation, and whether your existing electrical panel can handle the added load. A 200-amp panel upgrade alone can run $3,000 – $6,000, and we include that in the written price when it’s needed. You’ll get a line-item breakdown before any work starts, so you can see exactly what the Owens Corning materials cost, what the labor costs, and what the permit fees add up to. No lump-sum mystery number.
Every addition and ADU we build comes with our 365-Day Done Right Promise: if something’s not right within a year of completion, we make it right at no cost to you. The Owens Corning product warranties (lifetime on Duration shingles, for example) run separately and we’ll register them for you.
See the difference
Before
After
Before
After
Before
AfterDIY or Call Us?
Let’s be straight about what you can safely do and what you shouldn’t touch. You can absolutely inspect your own attic insulation: poke your head up there, measure the depth, and look for signs of rodent activity or water staining. You can walk your roofline and look for missing or curled shingles. That’s good homeowner diligence and it helps you have an informed conversation with us.
You should not try to install insulation, roof underlayment, or weather barrier on your own addition or ADU project. The Title 24 compliance alone is complicated enough that we see DIY jobs fail inspection regularly in Woodland Hills. And foam board installation, roof decking, and working at height on a sloped roof are genuinely dangerous for someone who doesn’t do them every week. If you’ve found a problem, call us at (831) 290-6866 and we’ll come look. The estimate is free, and the written price arrives before any work begins.
FAQs

Owens Corning fiberglass batts and blown-in insulation will last the life of the structure if they stay dry and undisturbed. What shortens that lifespan in our climate is heat cycling, rodents, and roof leaks. We’ve pulled out 40-year-old batts that were still doing their job, and we’ve replaced 15-year-old insulation that was shredded by rodents. It depends on what’s happened above them.
Call (831) 290-6866 for an inspection if you’re unsure what you’ve got up there.
In some cases, yes. If the batts are intact but simply thin in spots, we can add blown-in AttiCat on top to reach the R-38 required by code – that’s often cheaper than a full tear-out. But if there’s rodent contamination, water damage, or mold, the honest answer is that it needs to come out. We’ll show you what we’re seeing before we recommend either path.
Call (831) 290-6866 and we’ll get on a ladder and look.
A garage conversion typically runs 4 – 6 months from permit submission to final inspection. A ground-up detached ADU runs 6 – 10 months. The City of Los Angeles plan check and permitting process adds time you can’t shortcut, and hillside lots sometimes require additional geotechnical review. We’ll give you a realistic schedule in the written estimate, not a best-case scenario.
Call (831) 290-6866 to talk through your specific site and timeline.
We stock Owens Corning PINK batts in R-13, R-19, and R-30, FOAMULAR rigid board in common thicknesses, and we keep Duration shingles on hand for roof tie-ins. For anything unusual or a full roof replacement, we order directly through our Owens Corning supply account. We can also source KraftMaid, Cambria, and Silestone for interior finishes if you’re combining the addition with a kitchen or bath remodel.
Call (831) 290-6866 and we’ll check availability for your specific product before you commit to anything.
Ready to Get a Written Price?
If you’re planning a home addition or ADU in Woodland Hills and want the Owens Corning components done right the first time, call (831) 290-6866. Isaac Pruett and the Mason Remodeling Co Woodland Hills team will walk the site, talk through what’s there now, and give you a written line-item price before any work starts. Tell me what you need done. I’ll tell you what it takes and what it costs. Then we get to work.
Written by Isaac Pruett, Owner, Mason Remodeling Co – Woodland Hills, CA at Mason Remodeling Co Woodland Hills, serving Woodland Hills and nearby areas.


