







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Sterling Home Additions & ADU: The Woodland Hills Owner’s Guide
If you have a Sterling home addition or ADU in Woodland Hills that’s failing, we get it: you don’t want a lecture, you want a number and a date. A Sterling home addition or ADU project in Woodland Hills typically runs $45,000 to $130,000 installed, depending on square footage, foundation work, and what’s behind the walls once we open them up. Most Sterling additions and ADUs show their age through water intrusion at the roofline, settling cracks at the marriage line, or failing sealant around window openings, and the fix usually starts with a full assessment of what’s still sound before we quote anything.
We’re Mason Remodeling Co Woodland Hills. We’re an independent contractor, not affiliated with Sterling, which means we tell you the truth about your existing structure whether that’s good news or a bill you didn’t want. We stock the common replacement parts, we know the quirks of Sterling’s framing and connection details, and we put our price in writing before a single tool comes off the truck.
Which Sterling Models This Applies To

Sterling home additions and ADUs built across Woodland Hills fall into a few recognizable categories: the single-story bump-out addition, the attached ADU with its own kitchenette and bath, and the garage-conversion ADU. The trick is that Sterling didn’t always badge their framing or leave a model plate, so the way to identify what you have is measurement, not memory. Measure the wall stud spacing, the header depth over the window openings, and the roof pitch, and bring those numbers when you call us. That gets you to the right answer faster than any model name.
The compatibility gotcha most Woodland Hills owners run into: Sterling used 2×4 exterior wall framing on many pre-2010 additions, but Woodland Hills now requires 2×6 minimums on new ADU construction under current California energy code. That means if you’re extending or repairing a wall section, we often have to fur out the 2×4 framing to bring the assembly to code. It’s the difference between a $800 repair and a $4,000 wall-section rebuild, and we’ll tell you which one you’re looking at before we start. For materials, we stock OEM-equivalent structural connectors and hold-downs matched to Sterling’s original layout, and we use quality aftermarket pieces where they spec the same or better, which they usually do for fasteners and flashing.
If your addition or ADU shares wall space with KraftMaid, Cambria, or Silestone finishes, we stock compatible trim, clips, and edge profiles for those brands too, so you’re not chasing parts from a second contractor.
Styles & brands we work with







Key Takeaways
- Sterling additions and ADUs in Woodland Hills typically run $45,000 – $130,000 when replacement or major repair is involved
- Pre-2010 Sterling framing is often 2×4, which does not meet current ADU energy code in Woodland Hills without furring or reframing
- Written price before work starts, every time, no verbal estimates that grow on the final bill
- 365-Day Done Right Promise: if it’s not right within a year, we make it right at no cost
- Call (831) 290-6866 and a live person answers, day or night
Signs Your Sterling Home Additions & ADU Is Failing
- Recurring drywall cracks at the ceiling-wall junction. This usually means the addition is settling independently from the main house, likely because the foundation was a slab-on-grade pour without enough compaction underneath. Once the crack comes back after a patch, you’re looking at a structural fix, not a mud-and-tape job.
- Water staining in the corners where the addition roof meets the original house. The marriage line between old and new roofing is the first place Sterling additions fail in Woodland Hills because heat and UV dry out the transition flashing. Once water gets behind that flashing, the sheathing rots fast.
- Doors and windows that stick during summer months. Woodland Hills swings from dry heat to cool nights, and under-built headers over openings will sag or swell with the temperature. A door that only sticks in August is telling you the header’s overwhelmed.
- Cold drafts or visible daylight at exterior wall corners. The corner framing on older Sterling work often lacks proper shear paneling, and as the structure settles, the drywall pulls away from the corner bead. That gap is exactly where air and insects come through.
- Spongy or bouncy floors in the addition. If the floor joists were spanned too far or notched incorrectly for plumbing, the floor deflects under weight. You might feel a soft spot near the kitchen sink or a bounce when someone walks through the room. That’s a structural concern, not a finish problem.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
In Woodland Hills, the realistic range for a Sterling home addition or ADU replacement or major repair sits between $45,000 and $130,000. The big drivers are square footage, whether you’re doing foundation work or just framing and finishes, and what code requirements have changed since the original build. A small bump-out addition with a simple gable roof lands at the bottom of that range. A full ADU with kitchen, bath, and its own electrical panel lands near the top.
Every price we give includes three things, no surprises: parts, labor, and the written quote you approve before we start. We don’t do allowances that balloon, we don’t do change orders because we “found something” mid-job, and we don’t leave you with a punch list at the end. Your written guarantee states exactly what’s covered and for how long: 365 days from the completion date, with a free return visit if anything we touched fails during that year. That’s the 365-Day Done Right Promise, and it’s not an upsell. It’s just how we work.
DIY or Call Us?

Here’s the honest split. You can safely identify the problem: check corner flashing for gaps, look for cracks that have reopened after a patch, note which season the doors stick. You can also safely document everything with photos and measurements before you call. That saves us both time and helps us get you a useful first number over the phone.
What you shouldn’t do is open up a load-bearing wall, pull off flashing at the roofline, or jack up a sagging floor to look at joists, because that’s where you can drop a roof or compromise the structure without realizing it. Structural work on an addition or ADU is not a weekend project, and a mistake there costs more than the original repair ever would. If it involves lifting, cutting framing, or working against gravity, call us. Isaac Pruett grew up in Los Angeles and learned his trade the long way, including years of hands-on work near Warner Center and across Woodland Hills, so when we tell you what’s involved, you’re getting the real picture, not a sales pitch.
If you’re not sure what you’re looking at, call (831) 290-6866. We’ll talk it through, and if it turns out to be simple, we’ll tell you it’s simple.
FAQs
The structural frame of a Sterling addition or ADU can last 50 years or more in Woodland Hills if the roof flashing holds and the foundation doesn’t shift, but the finish layers: windows, doors, siding, sealant, typically need major attention by year 20 to 25. Heat and sun wear out sealant faster than the framing ever wears out. Call (831) 290-6866 and we’ll assess what you’re actually working with.
Yes, most of the time. We’ve repaired dozens of failing additions and ADUs in Woodland Hills by reframing a section, replacing flashing, or adding shear paneling, and rebuilding only the parts that are genuinely gone. The repair vs. replace decision comes down to what percentage of the framing is compromised, and we’ll show you photos before we recommend anything. Call (831) 290-6866 for a straight answer.
A localized structural repair: one bad wall section, a failing roofline, a sagging corner, typically takes two to four working days. A full rebuild of a large addition or ADU runs six to twelve weeks depending on finishes. We give you the timeline in writing with the price.
We stock the common replacement parts for Sterling additions and ADUs on our trucks: structural hold-downs, ties, flashing profiles, and shear panel clips that match the original installation. If you need something discontinued or out of production, we source quality aftermarket equivalents that spec the same or better, and we tell you the difference before we install anything.
Tell me what you need done. I’ll tell you what it takes and what it costs. Then we get to work.
Call (831) 290-6866 to schedule your free estimate. A live person answers, day or night, and we’ll have Isaac or one of our vetted, background-checked technicians out to you with a photo ID badge and a clean marked uniform. Written price. Written guarantee. No drama.
Written by Isaac Pruett, Owner, Mason Remodeling Co – Woodland Hills, CA at Mason Remodeling Co Woodland Hills, serving Woodland Hills and nearby areas.


